DeSoto County, Florida
For Lease or Sale
Suitable for Hydrogen Development, Antenna Farm, Data Center, Fuel Cells
DeSoto County Plant LLC
FOR LEASE OR SALE
Seeking business partners who require diversified energy sources
34.260 ACRES - MANUFACTURING SITE IN FLORIDA
THREE ENERGY SOURCES
DESOTO COUNTY PLANT LLC
3800 NE ROAN ST
Arcadia, FL 34266
Martin F. Klingenberg, CEO
U.S. Cell: 239-404-3546
Email: desotowerke@gmail.com
GOAL: SELL, LEASE, OR PARTNER WITH FIRM REQUIRING THREE ENERGY SOURCES.
LNG: -81.81158157266269
LAT: 27.22317010754626
+ Sea Level 59ft/18m
Site size: 34.260 acres
680 ft owned driveway from ROAN ST to main gate
There are no environmental issues with the site.
The entire site is not located in a mandatory evacuation zone.
HISTORY
This site was previously owned and operated by the DESOTO COUNTY GENERATING CO LLC. The activity was generating electricity utilizing two GE 60 Hz Gas Turbines. The electricity was sold to a transmission company (FPL) which did not renew its seven-year contract. The GE Turbines were removed and the plant was purchased by DESOTO COUNTY PLANT LLC.
PLANT HAS THREE EXISTING ENERGY SOURCES:
1. The onsite natural gas station maintained by Energy Transfer flows at 50 pounds per second at a base load enough to power three GE 60Hz Gas Turbines. Gas flow can be increased. The gas preheating facility is on site.
2. 1.5 M Gallon Diesel Fuel Storage Tank with Unloading Station.
3. Three-phase electric power on site. Florida Power and Light Company Whidden Substation is adjacent to the Plant.
WATER SUPPLY:
a. 1.3 M Gallon demineralized water storage tank.
b. 750-thousand-gallon raw water storage tank.
c. Plant has a 20-year water use permit from the State of Florida allowing:
Annual Average - 76,100 gallons per day
Peak Month – 610,000 gallons per day.
Drought Annual Average is 77,400 gallons per day.
d. Two 600 feet deep-producing water wells.